• foto01

Studies


2007 // Pioltello – Treviglio - Italy

Model calibration and railway simulation of the effects of line unavailability due to construction works

2007 // Salerno - Sarno - Italy

Model calibration and railway simulation of the effects of line unavailability due to construction works

2007 // Firenze – Bologna - Italy

Model calibration and railway simulation of the effects of two line unavailabilities due to construction works

2007 // Roma – Pescara - Italy

Railway simulation for the compatibility between passenger long distance and regional trains on a regional line

2007 // Torino - Italy

Railway simulation for the compatibility between passenger long distance and regional trains on a regional line

2007 // Bologna - Italy

Timetable validation and train placement definition within a complex node in presence of infrastructure unavailability

2007 // Perugia - Italy

Timetable validation within a simple node

2008 // Firenze - Italy

Timetable validation within a complex node in presence of infrastructure unavailability

2008 // Torino - Italy

Timetable validation within a complex node in presence of infrastructure unavailability

 

  • foto01

Projects


2007 // Roma - Italy

Simulation of the whole Rome node in presence of technologic improvement and effect estimation

2008 // Roma - Italy

Timetable validation within a complex node in presence of infrastructure unavailability

2008 // Palermo - Italy

Timetable validation in presence of infrastructure unavailability for a metropolitan service line

2008 // Barletta - Bari - Italy

Railway simulation for scenario analysis for a regional line development

2008 // Bari - Italy

Railway simulation for scenario analysis within the new railway node configuration

2008 // Ferrocarril Transandino Cantral – Argentina - Chile

Railway simulation for scenario analysis within the new freight railway line configuration